Emulsion production microfluidic device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12172155
APP PUB NO 20220203354A1
SERIAL NO

17602178

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is an emulsion production microfluidic device which includes: a first channel, including an entry port configured to inject a phase to be dispersed, a second channel, including an entry port configured to inject a continuous phase and an emulsion exit port, and at least one array of microchannels, a height of each of the microchannels being smaller than a height of the first channel; the second channel includes a first part connected to the outlet of each microchannel and at least a second part along the first part, the first part being between the array of microchannels and the second part, the first part having a height greater that the height of each microchannel, and the second part having a height greater than the height of the first part.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUEPARIS FRA
ECOLE SUPERIEURE DE PHYSIQUE ET DE CHIMIE INDUSTRIELLES DE LA VILLE DE PARIS10 RUE VAUQUELIN PARIS 75005
PARIS SCIENCES ET LETTRES60 RUE MAZARINE PARIS 75006

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bazin, Gwénaëlle Houilles, FR 1 0
Bibette, Jérôme Paris, FR 28 106
Bremond, Nicolas Paris, FR 14 111

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 24, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 24, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 24, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00