Metal reinforced acetabular shell liner

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12171666
APP PUB NO 20210169654A1
SERIAL NO

16708913

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An acetabular shell liner for use in a hip arthroplasty surgical procedure is disclosed. The acetabular shell liner includes a semi-hemispherical inner bearing layer, which includes a rim and a dome attached to the rim. The semi-hemispherical inner bearing layer includes a polymeric material having a first thickness, at an apex of the dome, and a second thickness, at the rim, that is less than the first thickness. Additionally, the acetabular shell liner includes a semi-hemispherical outer reinforcement layer mated with and encasing the dome of the semi-hemispherical inner bearing layer. The semi-hemispherical outer reinforcement layer includes a metallic material to provide structural support to the semi-hemispherical inner bearing layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DEPUY IRELAND UNLIMITED COMPANYLOUGHBEG INDUSTRIAL ESTATE RINGASKIDDY CO CORK

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brandewie, Alena M Versailles, US 8 3
Keefer, Ryan C Warsaw, US 44 795

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 24, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 24, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 24, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00