Connection structure and attachment structure

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12171340
APP PUB NO 20230200551A1
SERIAL NO

18081314

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connection structure includes a first apparatus and a second apparatus. The first apparatus includes a first contact portion and a surrounding wall surface. The second apparatus includes a second contact portion and a hollow projection. The first apparatus and the second apparatus are connected as being rotatable relatively to each other around a magnetic force direction and attachable to and detachable from each other, as a result of attraction by magnetic force. The projection is located with a clearance being interposed between the wall surface and the first contact portion, where the projection can be tilted in accordance with pulling including a direction component perpendicular to the magnetic force direction. In the first apparatus, a clearance between a top portion and the projection in a first direction is larger than a clearance between the top portion and the projection in a second direction different from the first direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NINTENDO CO LTDKYOTO JAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Amano, Masaki Kyoto, JP 38 260
Kawamura, Tetsuji Kyoto, JP 2 2
Morita, Kensuke Kyoto, JP 37 606
Wakitani, Noboru Kyoto, JP 48 705

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 24, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 24, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 24, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00