Flexible display panel, flexible display device and method of forming flexible display panel

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12171109
APP PUB NO 20220158109A1
SERIAL NO

17523517

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A flexible display panel, a flexible display device and a method of forming the flexible display panel are provided. The flexible display panel includes: a substrate; thin film transistors arranged in an array on the substrate; an electroluminescent device arranged on the thin film transistors and driven by the thin film transistors, including a pixel defining layer and an electroluminescent material defined by the pixel defining layer;

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • BEIJING BOE TECHNOLOGY DEVELOPMENT CO., LTD.; CHENGDU BOE OPTOELECTRONICS TECHNOLOGY CO., LTD.

International Classification(s)

  • No Non-US Classification to display

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Jaeho Beijing, CN 300 2765
Lee, Myoungsoo Beijing, CN 13 129
Li, Qianshu Beijing, CN 1 0
Sun, Zhen Beijing, CN 74 234
Zeng, Cheng Beijing, CN 60 275

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • No Patent Citation Ranking to display

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 17, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 17, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 17, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00