System and method for auto switching video by system events

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12170072
APP PUB NO 20240331657A1
SERIAL NO

18129460

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for automatically switching input/output (“I/O”) between partitioned systems based on system events includes monitoring a system state for each of two or more systems sharing an electronic display, where each of the two or more systems includes a processor executing an instance of an operating system, selecting a system of the two or more systems sharing the electronic display in response to determining that a change has occurred in the system state of the of the selected system, and switching an input of an I/O switch to send data for display of one or more elements of the selected system to the electronic display.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LENOVO GLOBAL TECHNOLOGIES SWITZERLAND INTERNATIONAL GMBHC/O BRIGHT LAW AG BUNDESPLATZ 9 ZUG 6300

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cudak, Gary D Raleigh, US 379 3536
Parsonese, James Cary, US 13 20
Patel, Pravin S Cary, US 36 249
Shah, Mehul Austin, US 113 1616

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 17, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 17, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 17, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00