Dual fuel engine system and method for controlling dual fuel engine system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12168962
APP PUB NO 20240084745A1
SERIAL NO

17944900

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for controlling a dual fuel engine system includes estimating a total indicated engine load, where the total indicated engine load is based on a sum of a measured engine power and a power loss estimate. The method further includes determining a total fueling amount based on an engine speed and the total indicated engine load, where the total fueling amount includes a gas fueling amount and a diesel fueling amount. The method also includes controlling the dual fuel engine system using the total fueling amount.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CUMMINS POWER GENERATION INC1400 73RD AVENUE NE MINNEAPOLIS MN 55432

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anderson, Travis Alva Columbus, US 15 13
Bishnoi, Shashank Columbus, US 6 1
Borisuk, Paul Daniel Nashville, US 16 41
Gore, Jason A Highland Village, US 7 1
Isaacs, Matthew W Moncks Corner, US 12 7
Rosswurm, Mark A Columbus, US 19 196
Sleigh, Jamie Robert John Chester le Street, GB 6 1
Tandon, Atin Greenwood, US 13 9
zur, Loye Axel O Columbus, US 33 1317

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 17, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 17, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 17, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00