Completion string with a downhole power grid

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12168915
APP PUB NO 20240280002A1
SERIAL NO

18111827

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A plurality of flow control nodes are spaced along a production conduit for controlling a flow of formation fluids into the production conduit at different locations in the well. Each flow control node defines a flow path for entry of the formation fluids into the production conduit. A closure is operable to adjust the flow of the formation fluids into the production conduit. A generator at each zone generates electrical power in response to a portion of the flow directed through the generator. An electrical power grid interconnects the plurality of flow control nodes to collectively supply electrical power to the power grid. Each closure and other device components are operable with the electrical power from the power grid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HALLIBURTON ENERGY SERVICES INCP O BOX 819052 LEGAL INTELLECTUAL PROPERTY DEPARTMENT DALLAS TX 75381

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
El, Mallawany Ibrahim Dhahran, SA 47 53
Fripp, Michael Linley Singapore, SG 369 2820
Greci, Stephen Michael Little Elm, US 185 661

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 17, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 17, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 17, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00