Load carrier and method

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12168547
APP PUB NO 20230391508A1
SERIAL NO

18033135

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a charge carrier (10) with a main body (12) made of a particle foam, in particular of expanded polypropylene (EPP) or of expanded polyurethane (EPU), and with at least one functional element (20), which consists of a material that is harder than the particle foam. According to the invention, it is provided that the main body (12) has a depression (26) for each functional element (20), the depression being assigned to the respective element and having extending from it, in two mutually facing boundary surfaces (36), a respective receiving channel (38) which is bounded on three sides by the main body (12) and is open towards the depression (26), and that each functional element (20) has an anchoring portion (28), which protrudes into the depression (26) assigned to it and has retaining ribs (32) which project away from one another and each engage in one of the receiving channels.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FEURER FEBRA GMBH74336 BRACKENHEIM

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Goss, Oleg Eppingen, DE 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 17, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 17, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 17, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00