Auxiliary ADC-based calibration for non-linearity correction of ADC

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12166500
APP PUB NO 20230412186A1
SERIAL NO

18461152

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In an example, a system includes an input channel and a voltage to delay converter (V2D) coupled to the input channel. The system also includes a first multiplexer coupled to the V2D and an analog-to-digital converter (ADC) coupled to the first multiplexer. The system includes a second multiplexer coupled to the input channel and an auxiliary ADC coupled to the second multiplexer. The system includes calibration circuitry coupled to an output of the auxiliary ADC, where the calibration circuitry is configured to correct a non-linearity in a signal provided by the input channel. The calibration circuitry is also configured to determine the non-linearity of the signal provided to the ADC relative to the signal provided to the auxiliary ADC.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TEXAS INSTRUMENTS INCORPORATEDDALLAS TX

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arora, Vinam Bangalore, IN 4 0
Babu, Charls Bangalore, IN 7 9
Naru, Srinivas Kumar Bangalore, IN 3 0
Varshney, Himanshu Bangalore, IN 16 123
Viswanathan, Nagarajan Bangalore, IN 24 121

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 10, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 10, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 10, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00