Quartz MEMS piezoelectric resonator for chipscale RF antennae

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12166471
APP PUB NO 20220140813A1
SERIAL NO

17574200

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A RF antenna having a magnetostrictive film may be made by patterning selected portions of a top surface of the quartz wafer for deposition of electrode metal and deposition of the magnetostrictive film and depositing the electrode metal and the magnetostrictive film; temporarily bonding the quartz wafer to a handle wafer; thinning the quartz wafer to a desired thickness; etching the quartz wafer to define the outlines of at least one quartz resonator bearing the electrode metal and the magnetostrictive film; patterning selected portions of a bottom surface the at least one quartz resonator for deposition of electrode metal and at least one bond pad and depositing the electrode metal and the at least one bond pad; bonding the at least one quartz resonator to a substrate wafer; and releasing the at least one quartz resonator from the handle wafer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HRL LABORATORIES LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kubena, Randall L Oak Park, US 91 1455
Wall, Walter S Santa Monica, US 43 156

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 10, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 10, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 10, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00