DC voltage converters

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12166422
APP PUB NO 20240146194A1
SERIAL NO

18548401

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This application relates to methods and apparatus for DC voltage conversion. A DC converter (100) is described, with a charge pump circuit comprising a plurality of charge pump stages (1401, 1402-1, 1402-2) each charge pump stage comprising connections for respective first and second capacitors for that stage (C1A, C1B; C2A, C2B; C3A, C3B). The charge pump also has a switch network, wherein the switch network comprises, between each successive stage, four switching paths (S7AA, S7AB, S7Ba, S7BB; S6AA, S6AB, S6Ba, S6BB) for separately connecting a respective first electrode of each of the first and second capacitors of one stage to a first electrode either of the first and second capacitors of the preceding stage, so that the relevant capacitor of the one stage can be charged by the relevant capacitor of the preceding stage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LION SEMICONDUCTOR INC332 TOWNSEND STREET SAN FRANCISCO CA 94107

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Meyvaert, Hans Leuven, BE 15 119

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 10, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 10, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 10, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00