Connected structure of substrate and carbon nanotube wire

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12166324
APP PUB NO 20220013927A1
SERIAL NO

17485172

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

To provide a connected structure of a substrate and an electric wire with high connection reliability even when a carbon nanotube wire with an average diameter of 0.05 mm to 3.00 mm is used as the electric wire. The connected structure of the substrate and the carbon nanotube wire includes a substrate; a carbon nanotube wire made of one or more carbon nanotube aggregates each including a plurality of carbon nanotubes, the carbon nanotube wire having an average diameter of 0.05 mm to 3.00 mm; a conductive fixing member, part of which is provided between the substrate and the carbon nanotube wire; and a conductive member that electrically connects the carbon nanotube wire and the fixing member.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FURUKAWA ELECTRIC CO LTD6-4 OTEMACHI 2-CHOME CHIYODA-KU TOKYO 100-8322

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hatamoto, Kenji Tokyo, JP 14 5
Yamashita, Satoshi Tokyo, JP 110 588

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 10, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 10, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 10, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00