Method for producing all solid state battery

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12166179
APP PUB NO 20230411699A1
SERIAL NO

18456701

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing an all solid state battery using a precipitation-dissolution reaction of metallic Li as a reaction of an anode, includes a preparation step, a liquid composition preparation step, a coating layer formation step, and a separator formation step. The preparation step includes preparing a sulfide solid electrolyte represented by Li7-aPS6-aXa (X is at least one of Cl, Br, and I, and a satisfies 0≤a≤2), the liquid composition preparation step includes dissolving the sulfide solid electrolyte in an alcohol-based solvent to prepare a liquid composition, the coating layer formation step includes applying the liquid composition to an anode current collector to form a coating layer, the separator formation step includes forming a separator by volatilizing the alcohol-based solvent from the coating layer by drying, and the ratio of the sulfide solid electrolyte contained in the liquid composition is 10% by weight to 30% by weight.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHAAICHI-KEN 471-8571

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Morita, Keisuke Susono, JP 109 246
Suzuki, Yushi Mishima, JP 25 46
Yada, Chihiro Susono, JP 23 195

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 10, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 10, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 10, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00