Projection lens and projection apparatus

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12164088
APP PUB NO 20220269052A1
SERIAL NO

17734497

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A projection lens having an optical system includes: an incidence lens on which light from an electrooptic element is incident; and an emission lens positioned closest to a magnification side and emits an image toward a projection surface, in which an incidence optical axis of the incidence lens is shifted in a first direction orthogonal to the incidence optical axis with respect to a center of a screen of the electrooptic element, a projection angle, which is an angle of an emission optical axis of the emission lens with respect to the projection surface, is less than 90°, and assuming an effective diameter of the emission lens is DE, a focal length of an entire optical system including the emission lens is f, and a half angle of view of the entire optical system is ω, ω is ≥60°, and a value of PA defined by Expression (1)≥0.1 and ≥7. PA=DE/(f×tan ω) (1).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUJIFILM CORPORATION26-30 NISHIAZABU 2-CHOME MINATO-KU TOKYO 106-8620

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mori, Masao Saitama, JP 82 730
Nagatoshi, Yukiko Saitama, JP 65 252

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 10, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 10, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 10, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00