Quick submergence molten metal pump

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12163536
APP PUB NO 20190368494A1
SERIAL NO

16413142

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pump for transferring molten metal includes an intake tube, a motor, a rotor positioned at least partially within the bottom end of the intake tube, a rotor shaft positioned at least partially in the intake tube, the rotor shaft having a first end attached to the motor and a second end attached to the rotor. An overflow conduit is attached to the intake tube. The pump does not include a pump housing and preferably does not include a superstructure, so it is relatively small, light and portable. In use, the motor drives the rotor shaft and rotor to generate a flow of molten metal upward into the intake tube and into the overflow conduit where it is discharged.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MOLTEN METAL EQUIPMENT INNOVATIONS LLC15510 OLD STATE ROAD MIDDLEFIELD OH 44062

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cooper, Paul V Chesterland, US 150 14042

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 10, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 10, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 10, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00