Fiber raw materials processing system and operating method thereof

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12162052
APP PUB NO 20230089779A1
SERIAL NO

17947091

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a fiber raw material processing system and its operation method. The fiber raw material processing system is composed of a cutting module, a bulk pulping module, a salt slurry processing module, a pressure screen, a separation module, an inclined screen module, and an extrusion module and a recycling module, which are connected in series. The operating method of the fiber raw material processing system is to process absorptive articles such as diapers or sanitary napkins, etc., which are retained and made into fluff fiber raw materials through the purification and separation steps performed by the modules of the fiber raw material processing system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YI CHUN GREEN TECHNOLOGY CO LTDNO 761 SECTION 2 YOUGUAN ROAD LUZHU DISTRICT TAOYUAN CITY 338

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wu, Pei-Jen Taoyuan, TW 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 10, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 10, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 10, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00