Automatic grain processing apparatus and load monitoring and tracking system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12161065
APP PUB NO 20220015296A1
SERIAL NO

17413829

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed are systems and apparatuses for processing agricultural and other grains. The systems and apparatuses include integrated units for cleaning, drying, weighing, classifying, packaging, labelling, tracking, and load monitoring of grains. In some embodiments, the systems and apparatuses include a cleaning unit for depositing and sifting grains, a drying unit for moving grains through a hot environment, a grain weighing and classification unit, and a packaging and labelling unit for vacuum sealing and labelling grains, all in one integrated unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IMPÉRIO ASSESSORIA EM INFORMAÇÕES LTDARUA GEORGE OHM 230 CJS 143/144 SAO PAULO 04576-020

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Duarte, Lucas Luz Sao Paulo, BR 1 2
Joanyr, de Barros Sergio Sao Paulo, BR 1 2
Prates, Maria Angela Sao Paulo, BR 1 2
Yokogawa, Sergio Sao Paulo, BR 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 10, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 10, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 10, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00