Electronic device including a first substrate having plural phase shifters thereon, an opposite second substrate having plural patches thereon and an intervening dielectric layer

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12160026
APP PUB NO 20230387562A1
SERIAL NO

18358221

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electronic device is provided, including: a first substrate, a plurality of phase shifters, a second substrate, a plurality of patches, a common electrode layer, and a dielectric layer. The plurality of phase shifters are disposed on the first substrate. The second substrate is disposed opposite to the first substrate. The plurality of patches are disposed on the second substrate. The dielectric layer is disposed between the common electrode layer and the second substrate and on the plurality of patches. In addition, a thickness of the dielectric layer is greater than or equal to 5 μm and less than or equal to a thickness of the second substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CHIMEI INNOLUX CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tsai, Tsung-Han Miao-Li County, TW 731 6180

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 3, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 3, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 3, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00