Archery assembly and method

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12158321
APP PUB NO 20230349663A1
SERIAL NO

18213443

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An archery assembly and method are disclosed herein. The archery assembly, in an embodiment, includes an archery riser mount. The archery riser mount has a riser mounting portion that is configured to be secured to a rear surface of a riser of an archery bow. The archery riser mount also has an adjustment assembly supported by the archery riser mount. The adjustment assembly includes first and second portions that are moveably interfaced with each other. The first portion is configured to be moved, relative to the second portion, along an axis that intersects with a vertical plane. The archery assembly has a projectile support device supported by the first portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • QTM, LLC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fry, Kevin S Madison Heights, US 16 36
Loomis, Jonathan M Lynchburg, US 16 31
Summers, Daniel A Alpine, US 37 230

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 3, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 3, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 3, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00