Gas turbine engine combustor with a set of dilution passages

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12158270
APP PUB NO 20240200778A1
SERIAL NO

18104408

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combustor comprising a dome wall, an annular liner, a combustion chamber, a set of fuel cups, and a set of dilution passages for each fuel cup of the set of fuel cups. The set of fuel cups circumferentially spaced along the dome wall relative to the combustor centerline. The set of dilution passages terminating in a plurality of slots spaced about the corresponding fuel cup in the set of fuel cups.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GENERAL ELECTRIC COMPANY1 NEUMANN WAY MAIL DROP F16 EVENDALE OH 45215-6301

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Badhuk, Pabitra Bengaluru, IN 8 0
Bucaro, Michael T Arvada, US 41 21
Chakraborty, Aritra Bengaluru, IN 8 0
Chiranthan, R Narasimha Bengaluru, IN 30 20
Naik, Pradeep Bengaluru, IN 143 287
Pal, Sibtosh Mason, US 45 112
Panduri, Bhavya Naidu Bengaluru, IN 8 0
Patra, Ajoy Bengaluru, IN 52 37
Sinha, Roy Arijit Bangalore, IN 7 0
Vukanti, Perumallu Bengaluru, IN 85 132

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 3, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 3, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 3, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00