Solidothermal synthesis of a boron-containing zeolite with an MWW framework structure

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12157674
APP PUB NO 20220064011A1
SERIAL NO

17480364

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a process for the production of a zeolitic material having an MWW framework structure comprising YO2 and B2O3, wherein Y stands for a tetravalent element, said process comprising

    (i) preparing a mixture comprising one or more sources for YO2, one or more sources for B2O3, one or more organotemplates, and seed crystals,(ii) crystallizing the mixture obtained in (i) for obtaining a layered precursor of the MWW framework structure,(iii) calcining the layered precursor obtained in (ii) for obtaining the zeolitic material having an MWW framework structure,wherein the one or more organotemplates have the formula (I)R1R2R3N  (I)wherein R1 is (C5-C8)cycloalkyl, andwherein R2 and R3 are independently from each other H or alkyl, andwherein the mixture prepared in (i) and crystallized in (ii) contains 35 wt.-% or less of H2O based on 100 wt.-% of YO2 contained in the mixture prepared in (i) and crystallized in (ii), as well as to a synthetic boron-containing zeolite which is obtainable and/or obtained according to the inventive process and to its use.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BASF SEGERMANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dai, Yu Shanghai, CN 15 5
Müller, Ulrich Ludwigshafen am Rhein, DE 140 962
Maurer, Stefan Ludwigshafen am Rhein, DE 45 197
Meng, Xiangju Hangzhou, CN 24 33
Parvulescu, Andrei-Nicolae Ludwigshafen am Rhein, DE 108 413
Wang, Yeqing Hangzhou, CN 37 409
Xiao, Feng-Shou Hangzhou, CN 40 192

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 3, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 3, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 3, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00