Alloy nanoparticles loaded network structure and method for producing alloy nanoparticles loaded porous body

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12157112
APP PUB NO 20220305468A1
SERIAL NO

17608405

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A protein template is added to a solution in which metal ions of iron and copper are dissolved to introduce the metal ions into the protein template; the protein template is separated from metal ions that have not been incorporated in the protein template; the metal ions that have been incorporated in the protein template are reduced to obtain a protein containing alloy nanoparticles of iron and copper; a sol or gel in which a co-continuous body is dispersed is frozen; the frozen sol or gel is dried in a vacuum to obtain a porous body; the porous body is allowed to support the alloy nanoparticle containing protein; and the protein is removed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON TELEGRAPH AND TELEPHONE CORPORATIONTOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iwata, Mikayo Musashino, JP 34 55
Komatsu, Takeshi Musashino, JP 82 289
Nohara, Masaya Musashino, JP 40 63
Taguchi, Hiroaki Musashino, JP 63 320

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 3, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 3, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 3, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00