Pipeline inspection device with enhanced image control

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12155973
APP PUB NO 20230300299A1
SERIAL NO

18200122

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pipeline inspection system may include a cable that may be configured to be directed into a conduit. The pipeline inspection system may further include a camera disposed on a distal end of the cable and operable to capture an image. The pipeline inspection system may further include a monitor including a display configured to display an image. The pipeline inspection system may further include an electronic processor that may be configured to receive a user input indicating a characteristic of the conduit. The electronic processor may be further configured to determine an image setting of the display based on the characteristic of the conduit. The electronic processor may be further configured to control the monitor to display the image on the display according to the image setting.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MILWAUKEE ELECTRIC TOOL CORPORATION13135 WEST LISBON ROAD BROOKFIELD WI 53005

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Turner, Christopher J Lannon, US 80 544

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 26, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 26, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 26, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00