Programmable gain amplifier with impedance matching and reverse isolation

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12155360
APP PUB NO 20230268899A1
SERIAL NO

17674976

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A programmable gain amplifier includes a programmable resistor ladder deployed across Nmax junction nodes and controlled by Nmax−1 resistor control signals, where Nmax is an integer greater than one; a common-gate cascode amplifier multiplexer comprising Nmax common-gate cascode amplifiers configured to receive Nmax internal voltages at the Nmax junction nodes and output Nmax output currents in accordance with Nmax amplifier control signals, respectively, to an output node that is loaded with a load; and an AC (alternate current) coupling capacitor configured to couple an input node to the first junction node.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
REALTEK SEMICONDUCTOR CORP2 INNOVATION RD II SCIENCE PARK HSINCHU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lin, Chia-Liang (Leon) Fremont, US 121 172

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 26, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 26, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 26, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00