Semiconductor device and semiconductor system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12154610
SERIAL NO

17847967

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor device capable of changing a data programming process in a simple manner according to a situation is provided. The semiconductor device includes a plurality of memory cells, a programming circuit for supplying a programming current to the memory cell, and a power supply circuit for supplying power to the programming circuit. The power supply circuit includes a charge pump circuit for boosting the external power supply, a voltage of the external power supply according to the selection indication, and a selectable circuit capable of switching the boosted voltage boosted by the charge pump circuit. The control circuit further includes a control circuit for executing data programming processing by the programming circuit by switching the selection indication.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RENESAS ELECTRONICS CORPORATIONKANAGAWA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kanda, Akihiko Tokyo, JP 45 149
Matsubara, Ken Tokyo, JP 104 929
Saito, Tomoya Tokyo, JP 42 508
Shimoi, Takahiro Tokyo, JP 3 0
Takeda, Koichi Tokyo, JP 102 1910
Watanabe, Genta Tokyo, JP 5 30

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 26, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 26, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 26, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00