Starting an alternative device after querying a knowledge graph for alternative devices associated with an intended function

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12153963
APP PUB NO 20220276897A1
SERIAL NO

17623677

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A resource scheduling method and system, and a computer-readable storage medium are provided. The method comprises: a control instruction inputted by a user (S101) is acquired; on the basis of the control instruction, an intended device (S102) is determined; in the case where the intended device is not able to be started, with regard to each function of the intended device, a constructed knowledge graph is queried for alternative devices associated with the function, the knowledge graph having a plurality of functions stored therein as well as devices associated with the plurality of functions (S103, S105); and a device to be started is determined from all the alternative devices and starting the determined device (S106). In the resource scheduling method, in the case where an intended device specified by a user is not able to be started, alternative devices are appropriately determined.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GREE ELECTRIC APPLIANCES INC OF ZHUHAI519000 GUANGDONG CITY OF ZHUHAI PROVINCE QIANSHAN ZHUHAI CITY GUANGDONG PROVINCE 519000
ZHUHAI LEAYUN TECHNOLOGY CO LTDROOM 601 NO 8 LIANSHAN LANE JIDA JINGSHAN ROAD ZHUHAI CITY GUANGDONG 519015

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hu, Guangxu Guangdong, CN 2 1
Hu, Zhihua Guangdong, CN 12 58
Huang, Zirong Guangdong, CN 6 1
Jia, Jutao Guangdong, CN 7 4
Wei, Deping Guangdong, CN 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 26, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 26, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 26, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00