Carbon-fibre composite high-pressure hydrogen storage tank and manufacturing process thereof

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12152728
APP PUB NO 20230092930A1
SERIAL NO

17993947

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A carbon-fibre composite high-pressure hydrogen storage tank and a manufacturing process thereof are provided. The hydrogen storage tank includes a tank body, where a gas guide port is formed in one side of the tank body, a reinforcing member for improving the strength of the tank body is arranged in an inner cavity of the tank body, a side end of the reinforcing member is fixedly connected to an inner wall of the tank body, and the tank body and the reinforcing member are all made of the carbon-fibre composite. The whole strength and rigidity of the hydrogen storage tank can be improved and safer and more reliable hydrogen storage tank under a high pressure can be ensured.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WANG MENGJUN312500 ZHEJIANG COUNTY XINCHANG PROVINCE AO AO TOWN NANSHAN VILLAGE SHAOXING CITY ZHEJIANG PROVINCE 312500

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wang, Mengjun Xiamen, CN 33 116

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 26, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 26, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 26, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00