Operation analysis method for production plant

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12152479
APP PUB NO 20220213774A1
SERIAL NO

17608997

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is an operation analysis method for a production plant (1), including: acquiring, with use of a Doppler LIDAR (5), a distribution of three-dimensional wind condition data at positions of an upper space of the production plant (1) and a surrounding space thereof including an arrangement region for an air-cooled heat exchanger (2); acquiring environment data indicating a state of a natural environment that affects operation of the air-cooled heat exchanger (2); and learning, through a numerical analysis with use of a computer, based on a distribution of the three-dimensional wind condition data and on the environment data, a correspondence between a distribution pattern of the three-dimensional wind condition data and the environment data.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JGC CORPORATIONNISHI-KU YOKOHAMA-SHI KANAGAWA 220-6001

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Asaka, Teru Kanagawa, JP 5 5
Kakutani, Yuzuru Kanagawa, JP 9 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 26, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 26, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 26, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00