Wood article and process for the preparation of the wood article

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12152130
APP PUB NO 20220089839A1
SERIAL NO

17424331

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to a wood article and a process for preparing the wood article. In particular, the present disclosure relates to a wood article comprising a wood substrate comprising acidic substances and having at least one major surface; an adhesion promoting layer directly applied on the major surface of the wood substrate; and a Michael Addition curing coating applied on the adhesion promoting layer, wherein the adhesion promoting layer is formed by a composition comprising a functional silane comprising amino and/or imino functional groups; and wherein the Michael Addition curing coating is formed from a two-component curable coating composition.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GUANGDONG HUARUN PAINTS CO LTDFOSHAN SHI GUANGDONG SHENG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Duan, Gang Cleveland, US 322 1216
Fan, Shigang Foshan, CN 15 1
Zhao, Xi Foshan, CN 56 59

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 26, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 26, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 26, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00