Portable utility vise device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12151340
SERIAL NO

18655364

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A portable utility vise device is provided utilizing a clamping assembly having a front elongate frame member, a rear elongate frame member, a left elongate frame member and a right elongate frame member. The left and right elongate frame members may each utilize a clamp bar coupled to an outer side surface thereof. Each clamp bar may have a rear clamp jaw disposed at a distal terminal end thereof. The front elongate frame member may utilize a clamp screw assembly. The portable utility vise device may further utilize a vise assembly coupled to the clamping assembly and having a left vise carriage and a right vise carriage. The left and right vise carriages may each have an elongate channel and a translation screw disposed therein. The left and right vise carriages may each have at least one coupling receptacle structure partially disposed within their respective elongate channels.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EMMERT PHILIP HNot Provided

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Emmert, Philip H Sterling Heights, US 2 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 26, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 26, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 26, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00