Machining apparatus

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12151326
APP PUB NO 20220009009A1
SERIAL NO

17482956

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A machining apparatus includes a first frame including a first surface formed along a Z-axis direction and a second surface formed along a Y-axis direction. An X-axis moving mechanism and a Z-axis moving mechanism are disposed on the first surface side of the first frame. A Y-axis moving mechanism is disposed on the second surface side of the first frame. A second frame supports the first frame from the second surface side of the first frame. An A-axis rotating mechanism, a B-axis rotating mechanism, and a supporting mechanism that supports an object to be machined are moved by the Y-axis moving mechanism. The t Y-axis moving mechanism is disposed in a space located below the first frame in the Z-axis direction, and formed by the second flame.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CANON DENSHI KABUSHIKI KAISHASAITAMA PREFECTURE JAPAN SAITAMA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujiu, Suguru Tokyo, JP 1 0
Matsumaru, Seiichi Kanagawa, JP 1 0
Suzuki, Hitoshi Saitama, JP 446 10083

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 26, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 26, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 26, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00