Hydrocarbon reclamator

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12151205
APP PUB NO 20230020768A1
SERIAL NO

17867639

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydrocarbon reclamator consists of a closed chamber having an exhaust inlet port, a hydrogen inlet port, and a hydrocarbon outlet port. A magnetic flux is generated at the base of the closed chamber and a rotor is suspended by the magnetic flux within the closed chamber. The rotor is formed as a Tesla turbine having axially spaced discs concentrically mounted on a central shaft, a catalyst is formed on surfaces of the discs, and flow holes are formed through the discs. Venturi forces direct gas to release kinetic energy against the discs, so that hydrogen entering the chamber combines with carbon entering the chamber to form a hydrocarbon that exits the chamber via the hydrocarbon outlet port.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CROWL JOSHUA LEEBOISE ID

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Crowl, Joshua Lee Boise, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 26, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 26, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 26, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00