Condensate recovery unit

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12151197
APP PUB NO 20220062811A1
SERIAL NO

17464990

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Production equipment and methods which reduce “gray” or off-specification production and improve central processing facility (CPF) efficiency. The process is a combination of unit operations (heat exchange, pumping, and separation) to produce an on-spec gas product, an on-spec condensate product, and/or on-spec oil product. It does so by placing the feed under pressure and heating it to the point that it can be vaporized and separated. The blended components are modulated dependent upon the composition of the produced fluids, produced gas, and off-specification fluid to efficiently produce on-specification products.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CONOCOPHILLIPS COMPANY925 N ELDRIDGE PARKWAY LEGAL TECHNOLOGY & IP DEPT ATTN DOCKETING HOUSTON TX 77079

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dinsdale, Travis O Calgary, CA 1 0
Embry, Dale L Houston, US 17 43
Kadar, James Calgary, CA 1 0
Kiesewetter, Jonathan J Calgary, CA 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 26, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 26, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 26, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00