Reactive power supplier control device and reactive power supplier control method

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12149081
APP PUB NO 20230187938A1
SERIAL NO

17925017

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Current information is information on a current time step for a power system including a reactive power supplier. A plurality of pieces of future information are a plurality of pieces of information on a plurality of future time steps for the power system. Power installation information is information on installations constituting the power system. An optimal power flow problem is formulated by an objective function and a plurality of constraint expressions based on the current information, the plurality of pieces of future information, and the power installation information. The control command is set based on a variable determined by the optimal power flow. In at least one of the objective function and the plurality of constraint expressions, amounts of variation of an input of the reactive power supplier at the current step and the plurality of future steps of the reactive power supplier are accumulated.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATION7-3 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 1008310 ?1008310

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Takaguchi, Yusuke Tokyo, JP 3 18
Yamane, Keisuke Tokyo, JP 21 505
Yasunami, Kazuhiro Tokyo, JP 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 19, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 19, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 19, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00