Semiconductor device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12149053
APP PUB NO 20230327406A1
SERIAL NO

18193980

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a semiconductor device, a quantum dot group includes a stack of plural quantum dot layers having different central wavelengths at which respective gains are maximum. A part of or all of the quantum dot layers are stacked so that the central wavelengths sequentially shifts along a stacking direction. The quantum dot group includes a longest wavelength layer group composed of some quantum dot layers including a longest wavelength layer having a longest central wavelength and at least one quantum dot layer stacked on the longest wavelength layer. The longest wavelength layer or the longest wavelength layer group has a larger gain at the central wavelength than the gain at the central wavelength of each of the other quantum dot layers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571
DENSO CORPORATION1-1 SHOWA-CHO KARIYA-CITY AICHI-PREF 448-8661
QD LASER INCKEIHIN BLDG 1F 1-1 MINAMIWATARIDACHO KAWASAKI-KU KAWASAKI-SHI KANAGAWA 210-0855
MIRISE TECHNOLOGIES CORPORATION500-1 MINAMIYAMA KOMENOKI-CHO NISSHIN-SHI AICHI-KEN 470-0111

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kamata, Yuki Nisshin, JP 22 68
Nishi, Kenichi Kawasaki, JP 21 300
Ohnishi, Yutaka Kawasaki, JP 14 49
Oyama, Koichi Nisshin, JP 24 169
Takemasa, Keizo Kawasaki, JP 7 4
Yamada, Hitoshi Nisshin, JP 145 2608

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 19, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 19, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 19, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00