Axial pump and riser

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12146508
APP PUB NO 20230383753A1
SERIAL NO

17826111

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A device for pumping molten metal includes a pump configured to pump molten metal, wherein the pump comprises (i) a motor, (ii) a shaft having a first end connected to the motor, and a second end connected to a rotor, wherein the rotor is configured to push molten metal upwards as it rotates. At least part of the shaft and the rotor are positioned in a conduit of a riser. The riser has an outer surface, a front, a bottom, a two-stage conduit, an inlet and an outlet above the inlet and below the motor. The two-stage conduit has a lower stage and a an upper stage, wherein the lower stage is generally cylindrical and the upper stage has a circular cross-sectional portion and one or more lobes extending from and in communication with the circular cross-sectional portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MOLTEN METAL EQUIPMENT INNOVATIONS LLC15510 OLD STATE ROAD MIDDLEFIELD OH 44062

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cooper, Paul V Chesterland, US 150 14042

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 19, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 19, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 19, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00