Propulsion device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12146473
APP PUB NO 20230265837A1
SERIAL NO

17675489

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A propulsion device is provided that utilizes a propulsion system that does not require expulsion of mass from the object being propelled or from the propulsion device itself. The present invention utilizes rotating disks (having a relatively large mass) interacting with freely rotating point masses (having relatively little mass; in a preferred embodiment, a point mass has a mass equal to approximately 0.018% of the mass of a rotating disk), to produce relatively large amounts of centripetal acceleration from zero to π radians of rotation, or less, without a corresponding acceleration from π to 2π radians, and thereby produce relatively large amounts of positive thrust that may be applied to an object to produce propulsion of that object.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PNETICS LLCLAS VEGAS NV

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hicksted, Richard L Reno, US 5 148
Jaeger, Robert H Reno, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 19, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 19, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 19, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00