Switchable rocker arm for controlling the lift of a valve bridge or a single valve of valve train group of an internal combustion engine and valve train group comprising at least a such switchable rocker arm

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12146427
APP PUB NO 20230366335A1
SERIAL NO

18247005

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A switchable rocker arm to control the lift of a valve bridge or of a single valve of a valve train group of an internal combustion engine; the switchable rocker arm being able to rotate around a first axis and comprising: a cam body, which is configured to be rotated by a cam; a valve body, which is configured to act upon the valve bridge or the single valve; wherein the switchable rocker arm can selectively be switched between a first configuration, in which the rotation of the cam body around the axis generates a movement of the valve body, and a second configuration, in which the rotation of the cam body around the axis does not generate any movement of the valve body.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STREPARAVA S P A CON SOCIO UNICO25030 ADRO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ferrario, Davide Adro, IT 1 0
Magni, Matteo Adro, IT 1 0
Mega, Francesco Adro, IT 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 19, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 19, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 19, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00