Thermal energy storage system coupled with a solid oxide electrolysis system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12146424
APP PUB NO 20230323793A1
SERIAL NO

18204910

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An energy storage system (TES) converts variable renewable electricity (VRE) to continuous heat at over 1000° C. Intermittent electrical energy heats a solid medium. Heat from the solid medium is delivered continuously on demand. Heat delivery via flowing gas establishes a thermocline which maintains high outlet temperature throughout discharge. The delivered heat which may be used for processes including power generation and cogeneration. In one application, the energy storage system provides higher-temperature heat to a solid oxide electrolysis system to maintain in an electrolysis operating temperature range during operation and nonoperation, thereby increasing the efficiency of the temperature control.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • RONDO ENERGY, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ferhani, Yusef Desjardins Menlo Park, US 46 33
O'Donnell, John Setel Oakland, US 69 462

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 19, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 19, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 19, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00