Method for producing copolymer, copolymer produced therefrom, and thermoplastic resin composition including the same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12146013
APP PUB NO 20220204666A1
SERIAL NO

17606710

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a method for producing a copolymer, the method for producing a copolymer including: step (S10) for adding aromatic vinyl-based monomers substituted with alkyl groups and vinyl cyan-based monomers to perform polymerization in the presence of a polymerization initiator, wherein the vinyl cyan-based monomers are collectively added before initiation of the polymerization in step (S10), monomer droplets are continuously divisionally added during the polymerization in step (S10), and the monomer droplets contain part or all of the aromatic vinyl-based monomers substituted with alkyl groups, and relates to a copolymer produced therefrom, and a thermoplastic resin composition including the same.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LG CHEM LTDSEOUL SOUTH KEREAN SEOUL

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hong, Sung Won Daejeon, KR 19 53
Ju, Min Cheol Daejeon, KR 15 5
Kim, In Soo Daejeon, KR 89 377
Lee, Hyung Sub Daejeon, KR 20 26
Shin, Min Seung Daejeon, KR 17 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 19, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 19, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 19, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00