Hybrid propulsion systems

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12145734
APP PUB NO 20220204171A1
SERIAL NO

17135800

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hybrid propulsion system can include a turbomachine having a compressor, a combustion chamber, and a compressor turbine. The compressor can be connected to the compressor turbine via a first shaft. The system can include a hybrid drive assembly which can include a power turbine in fluid communication with an outlet of the compressor turbine to be driven by compressor turbine exhaust to drive a second shaft that is disconnected from the first shaft. The hybrid drive assembly can also include an electrical machine mechanically coupled to the second shaft either to convert rotational energy to electrical energy or to convert electrical energy to rotational energy of the second shaft.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HAMILTON SUNDSTRAND CORPORATIONFOUR COLISEUM CENTRE 2730 WEST TYVOLA ROAD CHARLOTTE NC 28217-4578

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ribarov, Lubomir A West Hartford, US 110 861
Veilleux,, Jr Leo J Wethersfield, US 98 717

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 19, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 19, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 19, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00