Nitride semiconductor device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12142644
APP PUB NO 20230215923A1
SERIAL NO

18117243

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A nitride semiconductor device includes a substrate, a drift layer and a block layer sequentially provided above the substrate, a gate opening penetrating through a block layer and reaching a drift layer, an electron transit layer and an electron supply layer sequentially provided above the block layer and along the inner surface of the gate opening, a gate electrode provided to cover the gate opening, a source opening penetrating through an electron supply layer and an electron transit layer and reaching the block layer, a source electrode provided in the source opening, and a drain electrode on the rear surface side of the substrate. Seen in a plan view, at least part of an outline of an end of the gate opening in the longitudinal direction follows an arc or an elliptical arc.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • PANASONIC HOLDINGS CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hirashita, Nanako Kyoto, JP 6 13
Shibata, Daisuke Kyoto, JP 164 974
Tamura, Satoshi Osaka, JP 111 732

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 12, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 12, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 12, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00