Active matrix substrate

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12142614
APP PUB NO 20230307465A1
SERIAL NO

18199142

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An active matrix substrate includes a plurality of source bus lines, a lower insulating layer covering the source bus lines, a plurality of gate bus lines formed above the lower insulating layer, and an oxide semiconductor TFT disposed to correspond to each pixel area. The oxide semiconductor TFT includes an oxide semiconductor layer disposed on the lower insulating layer, and a gate electrode disposed above the oxide semiconductor layer. The gate electrode is formed in a different layer from the gate bus lines, and is disposed to be separated from another gate electrode disposed in an adjacent pixel area. The gate electrode is covered by an interlayer insulating layer. The gate bus line is disposed on the interlayer insulating layer and in a gate contact hole formed in the interlayer insulating layer, and is connected to the gate electrode in the gate contact hole.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHARP KABUSHIKI KAISHA1 TAKUMI-CHO SAKAI-KU SAKAI CITY OSAKA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Daitoh, Tohru Sakai, JP 99 141
Hara, Yoshihito Sakai, JP 95 366
Hirata, Yoshiharu Sakai, JP 40 133
Imai, Hajime Sakai, JP 127 1004
Kawasaki, Tatsuya Sakai, JP 50 188
Kikuchi, Tetsuo Sakai, JP 195 1500
Maeda, Masaki Sakai, JP 74 371
Ueda, Teruyuki Sakai, JP 48 72

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 12, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 12, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 12, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00