Refrigeration cycle apparatus and method for controlling refrigeration cycle apparatus

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12140357
APP PUB NO 20230160616A1
SERIAL NO

17920092

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a refrigeration cycle apparatus, a refrigerant pipe is connected to a compressor, a first heat exchanger, an expansion valve, a second heat exchanger, a heat absorber, and the compressor sequentially in this order. R290 is used as refrigerant flowing through the refrigerant pipe. The heat absorber is provided in a portion of the refrigerant pipe between the compressor and the first heat exchanger or the second heat exchanger serving as an evaporator. The heat absorber is disposed in contact with an electric component. A branch pipe is connected in parallel with the portion provided with the heat absorber in the refrigerant pipe. The branch pipe is provided with a flow rate regulating valve.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATIONTOKYO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishiyama, Hiroki Tokyo, JP 39 66
Kanatani, Toshiki Tokyo, JP 7 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 12, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 12, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 12, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00