Nuclear island base slab of nuclear power plant, manufacturing method therefor, and nuclear island of nuclear power plant

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12139868
APP PUB NO 20230287645A1
SERIAL NO

18040511

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A nuclear island base slab of a nuclear power plant and a manufacturing method therefor, and a nuclear island of a nuclear power plant. The nuclear island base slab of a nuclear power plant includes a concrete base slab body and a plurality of air ducts embedded in the concrete base slab body. The air duct has an internal-penetrating bent pipe structure. A first end of the air duct is exposed on an upper surface of the concrete base slab body. A second end of the air duct is exposed on a side surface or the upper surface of the concrete base slab body.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHANGHAI NUCLEAR ENGINEERING RESEARCH & DESIGN INSTITUTE CO LTDNO 29 HONG CAO ROAD XUHUI DISTRICT SHANGHAI SHANGHAI CITY SHANGHAI CITY 200233

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheng, Shujian Shanghai, CN 3 0
Ge, Honghui Shanghai, CN 4 0
Han, Boyu Shanghai, CN 1 0
Liu, Qiang Shanghai, CN 382 3076
Zheng, Mingguang Shanghai, CN 8 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 12, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 12, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 12, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00