Wet pulp material processing machine

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12139852
APP PUB NO 20230068151A1
SERIAL NO

17796857

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In vertical concentrating washing machines, processed raw material is transported upward but ends up containing shower water. That is, the moisture content ends up increasing during the transport process even though the material has been dewatered. A transport blade (8) has a plate-like shape in plan view and includes a fan-shaped portion (10) that extends rearward in the rotational direction, developing into a fan shape, and the transport blade is attached such that a plate surface thereof has a slanted orientation with respect to the axis direction of a rotary shaft (6), with a forward side, in the rotational direction, of the plate surface being disposed lower than a rearward side thereof. A plurality of the transport blades (8) is attached so as to delineate a helix along the circumferential direction of the rotary shaft (6) while leaving a communicating portion that is straight in the vertical direction. Shower water falls from gaps (S) between the transport blade (8). The transport blades (8) have a fan shape that widens toward the inner wall side of the rotary drum (5). A surface area on which the material rests stably and a sufficient gap (S) are secured in a well-balanced fashion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAIZEN CO LTD496-1 DENBO FUJI-CITY SHIZUOKA 4170061

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ide, Takefumi Fuji, JP 6 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 12, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 12, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 12, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00