Biogas production from excrement

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12139739
APP PUB NO 20210198700A1
SERIAL NO

17192404

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing biogas includes: anaerobically digesting excrement with an additive, the additive including a pre-pupal stage of an insect from the scientific classification superfamily of Stratiomyoidea; and collecting the biogas. A method for producing an additive for anaerobic digestion of excrement includes: hatching eggs of an insect from the scientific classification superfamily of Stratiomyoidea in excrement; growing insect larvae by feeding with additional excrement; harvesting pre-pupal insect larvae; and grinding the pre-pupal larvae. An apparatus for producing an additive for anaerobic digestion of excrement includes: a tray having pivot along one lateral side and an upwardly sloping wall terminating with a lip along a lateral side opposite the pivot; a flume adjacent the lip; and a conveyor adjacent the pivot.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LAKESIDE POWER AND METHANE LLCCHARLOTTE NC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
El-Massri, Mahmoud A Charlotte, US 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 12, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 12, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 12, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00