Piezoelectric substrate, piezoelectric element and liquid ejection head

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12138926
APP PUB NO 20230202173A1
SERIAL NO

18069270

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A piezoelectric substrate includes: a substrate; a first electrode formed on the substrate; and a piezoelectric layer formed on the first electrode and containing potassium, sodium, and niobium. A full width at half maximum of an X-ray intensity peak on a plane (100) of the piezoelectric layer in a Psi axis-direction scan result of an X-ray diffraction measurement in which a surface of the piezoelectric layer is irradiated with X-rays at an angle of 54.74° from a direction perpendicular to the surface is more than 0° and 1.2° or less.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEIKO EPSON CORPORATIONSHINJUKU-KU TOKYO 163-08

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hamada, Yasuaki Nagano, JP 80 348
Nakayama, Masao Nagano, JP 119 881
Sakai, Tomohiro Nagano, JP 88 397
Shimizu, Toshihiro Fujimi-machi, JP 171 1487

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 12, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 12, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 12, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00