Sinuplasty instrument with deflectable guide rail

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12138410
APP PUB NO 20220211982A1
SERIAL NO

17588390

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus includes a body, a first shaft, an actuation assembly, and a dilation catheter. The first shaft includes a malleable distal portion. The actuation assembly includes a second shaft and an actuator. The second shaft is coaxially positioned about the first shaft. The actuator is operable to selectively bend the malleable distal portion of the first shaft. The dilation catheter is coaxially interposed between the first shaft and the second shaft. The dilation catheter includes an expandable dilator. The dilation catheter is operable to translate along the malleable distal portion of the first shaft.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ACCLARENT INC31 TECHNOLOGY DRIVE SUITE 200 IRVINE CA 92618

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fang, Itzhak Irvine, US 78 329
Palushi, Jetmir Irvine, US 130 423
Papadakis, Athanasios Newport Beach, US 28 89
Trott, Jordan R Redondo Beach, US 16 36

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 12, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 12, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 12, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00