Agricultural work vehicle
Number of patents in Portfolio can not be more than 2000
United States of America
Stats
-
Nov 12, 2024
Grant Date -
Jan 20, 2022
app pub date -
Nov 15, 2019
filing date -
Nov 15, 2019
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance
Loading Importance Indicators...

Calculated Rating
US Family Size
|
Non-US Coverage
|
Abstract
The invention relates to an agricultural work vehicle (100) for performing an agricultural work operation in an agricultural field, wherein said work vehicle comprises:
- a first drive module (2):a second drive module (4),a connecting element (6); said connecting element comprises a first axial end (8) and a second axial end (10);propulsion means (12) for propelling said work vehicle;steering means (14) for steering said work vehicle;a control unit (16) for controlling the operation of said work vehicle;wherein said first drive module (2) comprises a first chassis (18);wherein said second drive module (4) comprises a second chassis (20);wherein said first drive module (2) comprises drive means (90) for allowing said first drive module to move over ground, said drive means (90) being suspended on said first chassis (18);wherein said second drive module comprises drive means (92) for allowing said second drive module to move over ground, said drive means (92) being suspended on said second chassis (20);wherein said first axial end (8) of said connecting element (6) is being attached to said first chassis (18); and wherein said second axial end (10) of said connecting element (6) is being connected to said second chassis (20);wherein said work vehicle is comprising pivoting means (26), thereby allowing that the orientation of said first drive module (2) is being able to rotate in relation to the orientation of said second drive module (4), around an axis being essentially parallel to a longitudinal direction of said connecting element (6).
First Claim
all claims..Other Claims data not available
Family
Loading Family data...

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
AGRO INTELLIGENCE APS | 8200 AARHUS N |
International Classification(s)

- 2019 Application Filing Year
- B60G Class
- 647 Applications Filed
- 499 Patents Issued To-Date
- 77.13 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Green, Ole | Lem, DK | 11 | 221 |
# of filed Patents : 11 Total Citations : 221 | |||
Jæger, Claus Dühring | Skanderborg, DK | 2 | 1 |
# of filed Patents : 2 Total Citations : 1 | |||
Juul, Jacob Pilegaard | Skanderborg, DK | 2 | 1 |
# of filed Patents : 2 Total Citations : 1 | |||
Znova, Liubava | Tilst, DK | 3 | 2 |
# of filed Patents : 3 Total Citations : 2 |
Cited Art Landscape
- No Cited Art to Display
Loading Cited Art Landscape... 

Patent Citation Ranking
- 0 Citation Count
- B60G Class
- 0 % this patent is cited more than
- 1 Age
Forward Cite Landscape
- No Forward Cites to Display
Loading Forward Cite Landscape... 

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | May 12, 2028 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | May 12, 2032 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | May 12, 2036 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text
US Patent Application No: 12118978
Systems and methods for generating synthesized speech responses to voice inputs indicative of a user in a hurry
Abstract
The system provides a synthesized speech response to a voice input, based on the prosodic character of the voice input. The system receives the voice input and calculates at least one prosodic metric of the voice input. The at least one prosodic metric can be associated with a word, phrase, grouping thereof, or the entire voice input. The system also determines a response to the voice input, which may include the sequence of words that form the response. The system generates the synthesized speech response, by determining prosodic characteristics based on the response, and on the prosodic character of the voice input. The system outputs the synthesized speech response, which includes a more natural, relevant, or both answer to the call of the voice input. The prosodic character of the voice input and/or response may include pitch, note, duration, prominence, timbre, rate, and rhythm, for example.
Description
Claims
Claims data not available

Legal Events
Date | Code | Event | Description |
---|---|---|---|
Aug 20, 2024 | P | Publication | |
Jul 31, 2024 | STCF | INFORMATION ON STATUS: PATENT GRANT | free format text: PATENTED CASE |
Oct 09, 2023 | F | Filing | |
Oct 09, 2023 | FEPP | FEE PAYMENT PROCEDURE | free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |

Matter Detail

Country:
Application No:
Patent No:
Application Publication No:
Status:
Priority Date:
Filing Date:
Matter Type:
Local Registration No:
Docket No:
Secondary System Identifier (SSI):
Customer Application No:
Filing Type:
Request for Examination Date:
Parent Filing Date:
Complete Specification Date:
PCT Filing Date:
National Entry Date:
First Publication Date:
Allowance Date:
Grant Date:
Grant Publication Date:
Claims:
Independent Claims:
Law Firm:
Renewals Detail

Applicant:
Applicant ID:
Entity Size:
Renewal Status:
Renewal Base Date:
Renewal Trigger Date: